Sale!

SAE AS683E

$40.50

Installation Procedures and Torques for Fluid Connections
standard by SAE International, 10/28/2019

Category:

Description

These procedures cover the following:

Section 3 – Cone end connections for flared tube and brazed ferrule, with and without gasket.

Section 4 – Boss end connections, positioned type, with back-up ring.

Section 5 – Boss end connections, positioned type, without back-up ring.

Section 6 – Boss end connections, non-positioned type.

Section 7 – Bulkhead connections.

Product Details

Published:
10/28/2019
File Size:
1 file , 180 KB