Description
This paper discusses the implementation of new innovative technologies in a Continuous Commissioning Leading Energy Project (CCLEP). Results of a case study show that CCLEP implementation can improve building operations and reduce energy costs. Energy consumption is compared in detailbefore and after CCLEP. Results show average electricity savings of 26.8% and gas savings of 47.8%.
Units: Dual
Citation: ASHRAE Transactions, vol. 115, pt. 2, Louisville 2009
Product Details
- Published:
- 2009
- Number of Pages:
- 9
- File Size:
- 1 file , 650 KB
- Product Code(s):
- D-LO-09-071