Sale!

Seminar 19 — When Integrated Controls Are Not Integrated

$24.50

Conference Proceeding by ASHRAE, 2012

Category:

Description

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

Three case studies are shared where integrated controls did not work and lessons learned presented. These examples will help designers improve project delivery by learning from others’ mistakes.

19-1 Case Studies: How We Got This Student Union Building, Unified
Drew Rimmer, P.E., Henderson Engineering
This product contains: Recorded Presentation, Audio (mp3), Slides (pdf)

19-2 Case Studies: City Hall Out of Control- Overview
Howard J. McKew, P.E., BuildingSmartSoftware, Inc.
This product contains: Recorded Presentation, Audio (mp3), Slides (pdf)

19-3 Case Studies: Commissioning Finds Project without Control
Wade Conlan, P.E., Exp
This product contains: Recorded Presentation, Audio (mp3), Slides (pdf)

Product Details

Published:
2012
File Size:
1 file , 150 KB
Product Code(s):
D-SA12Sem19
Note:
This product is unavailable in Russia, Belarus