Sale!

API RP 95F

$64.50

Gulf of Mexico MODU Practices for the 2007 Hurricane Season – Interim Recommendations (WITHDRAWN – REPLACED BY APPENDIX K TO API 2SK)
standard by American Petroleum Institute, 04/01/2007

Category:

Description

This Recommended Practice supersedes RP 95F, First Edition, May 2006. RP 95 supplements API RP 2SK, RP 2I, and RP2SM for Gulf Of Mexico MODU mooring design, operation, inspection and maintenance practices during hurricane season. Topics addressed in RP 95F that will be part of the overall mooring design and MODU operations include:

  • Mooring Analysis
  • Mooring Design Criteria
  • Consequences of Failure
  • Indicative GOM hurricane extreme metocean conditions
  • Site-specific risk assessment and mitigation
  • Mooring hardware issues such as anchor system considerations and mooring system improvements
  • Mooring operation issues such as deployment, hurricane preparedness, and inspection

This RP was developed through a cooperative arrangement with the American Petroleum Institute’s Subcommittee on Offshore Structures – RP 2SK Task Group, the API Executive Committee on Drilling and Production Operations, and the Joint Industry Project entitled “US Gulf of Mexico Mooring Strength Reliability” (MODU JIP).

Product Details

Edition:
2nd
Published:
04/01/2007
Number of Pages:
42
File Size:
1 file , 760 KB
Product Code(s):
G95F02, G95F02, G95F02
Note:
This product is unavailable in Cuba, Iran, North Korea, Syria