Sale!

CH-93-05-3 — The Commissioning Process – How it Affects the Building Owner and Maintenance Contractor

$7.50

Conference Proceeding by ASHRAE, 1993

Category:

Description

Discusses the effects of the commissioning process on the long-term operations and maintenance of heating, ventilation and air conditioning systems in buildings. Deals with the construction process, testing, balancing and controls, documentation and training. Concludes by noting that ASHRAE GPC-1 has produced a commissioning guideline.

KEYWORDS: Commissioning, maintenance, operations, heating, ventilation, air conditioning.

Citation: Symposium, ASHRAE Transactions 1993, Vol.99, pt.1

Product Details

Published:
1993
Number of Pages:
4
File Size:
1 file , 460 KB
Product Code(s):
D-18193