Sale!

50th Anniversary Feature: Central Chilled Water Distribution Systems Design

$4.00

Journal Article by ASHRAE, 2009

Category:

Description

A single element malfunctioning in a central chilled water distribution system can lead to failure to attain design capacity, decrease in supplied water and wasted energy. This article shows how to avoid these failures, while spelling out the responsibilities of designers and owners. This article received recognition when it first appeared in the November 1974 issue of ASHRAE Journal. ASHRAE Journal celebrates the 50th anniversary of merging two engineering societies into ASHRAE by republishing articles of historical significance to the HVAC&R industry.

Units: I-P

 

Citation: ASHRAE Journal, vol. 51, no. 4, April 2009

Product Details

Published:
2009
Number of Pages:
6
File Size:
1 file , 1.5 MB
Product Code(s):
D-AJ09Apr03