Description
Establishes time response design criteria for safety-related operator actions to be used in design of light water reactor nuclear power plants. Specifies time requirements that are to be met to receive credit in the safety analysis for operator actions.
Product Details
- Published:
- 08/23/1994
- Number of Pages:
- 28
- File Size:
- 1 file , 2.2 MB