Sale!

ASHRAE Technology Award: Rethinking Hospital Design

$4.00

Journal Article by ASHRAE, 2012

Category:

Description

Using integrated design helped the Abbotsford Regional Hospital and Cancer Centre to achieve an annual savings of $475,000. Strategies included high-efficiency (85%) gas-fired hot water boilers, two at 4,900 kW and one at 2,000 kW, and a flue gas heat recovery system for building reheat loads and domestic hot water heating.

Product Details

Published:
2012
Number of Pages:
9
File Size:
1 file , 790 KB
Product Code(s):
D-AJ12Jun05
Note:
This product is unavailable in Russia, Belarus