Sale!

AT-90-01-3 — Transient Response of Fixed-Area Refrigerant Expansion Devices

$7.50

Conference Proceeding by ASHRAE, 1990

Category:

Description

A test set-up is described and data have been obtained on the response of a capillary tube and a plug orifice to a step change in refrigerant flow conditions. The transient data exhibited response times on the order of 3 to 5 minutes for the capillary tube and 30 to 40 seconds for the plug orifice. The effects of these differing response times on the transient response of a complete system may or may not be insignificant. They are not considered at this time.

KEYWORDS: refrigerants, plugs, capillary tubes, orifices, tubes, R22.

Citation: Symposium Papers, Atlanta, GA, 1990

Product Details

Published:
1990
Number of Pages:
5
File Size:
1 file , 390 KB
Product Code(s):
D-18460