Description
Discusses the effects of the commissioning process on the long-term operations and maintenance of heating, ventilation and air conditioning systems in buildings. Deals with the construction process, testing, balancing and controls, documentation and training. Concludes by noting that ASHRAE GPC-1 has produced a commissioning guideline.
KEYWORDS: Commissioning, maintenance, operations, heating, ventilation, air conditioning.
Citation: Symposium, ASHRAE Transactions 1993, Vol.99, pt.1
Product Details
- Published:
- 1993
- Number of Pages:
- 4
- File Size:
- 1 file , 460 KB
- Product Code(s):
- D-18193