Sale!

Seminar 19 — The "Road Less Traveled" Becomes a Highway: Design-Build Execution of Cleanroom Projects

$24.50

Conference Proceeding by ASHRAE, 2013

Category:

Description

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

Design-build has been growing in its popularity and frequency of use as a project delivery method; however, there are still some in the industry who remain skeptical about the use of design-build on technically complex projects. Cleanrooms are some of the most challenging HVAC projects you can encounter. This seminar presents a sample of cleanroom projects delivered using a design-build approach. It points out the good points and the challenges in using the D-B approach. It also covers both life science and microelectronics projects as well as offering us a view of project delivery in East Asia.

19-1 Design-Build At 10,000 Feet (What Did I Get Myself Into?)
E. Mitchell Swann, P.E., Member
This product contains: Recorded Presentation, Audio (mp3), Slides (pdf)

19-2 What Academic Institutions Don’t Know Will Cost Them
Steve Penson
This product contains: Recorded Presentation, Audio (mp3), Slides (pdf)

19-3 The View From the Middle Kingdom – Executing Design-Build in the China and East Asia Markets
Selina Yi Yin
This product contains: Recorded Presentation, Audio (mp3), Slides (pdf)

 

 

Product Details

Published:
2013
File Size:
1 file , 180 KB
Product Code(s):
D-DA13Sem19
Note:
This product is unavailable in Russia, Belarus