Sale!

Seminar 50 — Design to Commissioning in Cleanrooms for Performance and Reliability

$24.50

Conference Proceeding by ASHRAE, 2023

Category:

Description

This product is a zip file that contains files that consist of PowerPoint slides synchronized with the audio-recording of the speaker, PDF files of the slides, and audio only (mp3 format) as noted.

Cleanrooms are expensive to build and operate over their expected useful life. They are expected to be adaptable and reconfigurable. Commissioning and performance verification are the heart of “proof” proper space environmental conditions, whether for the chip inside a smart phone or pacemaker or sterility of a COVID-19 vaccine. The commissioning process verifies a cleanroom’s performance and reliability. The objective of the commissioning process is to be in “Static balance and under dynamic control around the agreed design operating set points”.

  1. Designing a Cleanroom HVAC System< /br> Yusuf Bhetasiwala, Member, Encon Expertise Pvt. Ltd., Mumbai, India
  2. Overview of an Integrated Commissioning Process for Performance and Reliability< /br> Conor Murray, ASHRAE Ireland, Dublin, Ireland
  3. Best Practices and Common Mistakes in Cleanroom Projects with a Focus on Energy and Ease of Maintenance< /br> Kapil Mehrotra, ISHRAE, Mumbai, India
  4. Case Study on Managing Room Differential Pressure Control Using Venturi Valves< /br> Mike Amstadt, BCxP, Associate Member, Mead & Hunt, Middleton, WI

Product Details

Published:
2023
Units of Measure:
Dual
File Size:
1 file , 98 MB
Product Code(s):
D-TO22Sem50
Sale!

Seminar 50 — Design to Commissioning in Cleanrooms for Performance and Reliability

$24.50

Conference Proceeding by ASHRAE, 2022

Category:

Description

This product is a zip file that contains files that consist of PowerPoint slides synchronized with the audio-recording of the speaker, PDF files of the slides, and audio only (mp3 format) as noted.

Cleanrooms are expensive to build and operate over their expected useful life. They are expected to be adaptable and reconfigurable. Commissioning and performance verification are the heart of “proof” proper space environmental conditions, whether for the chip inside a smart phone or pacemaker or sterility of a COVID-19 vaccine. The commissioning process verifies a cleanroom’s performance and reliability. The objective of the commissioning process is to be in “Static balance and under dynamic control around the agreed design operating set points”.

  1. Designing a Cleanroom HVAC System
    Yusuf Bhetasiwala, Member, Encon Expertise Pvt. Ltd., Mumbai, India
  2. Overview of an Integrated Commissioning Process for Performance and Reliability
    Conor Murray, ASHRAE Ireland, Dublin, Ireland
  3. Best Practices and Common Mistakes in Cleanroom Projects with a Focus on Energy and Ease of Maintenance
    Kapil Mehrotra, ISHRAE, Mumbai, India
  4. Case Study on Managing Room Differential Pressure Control Using Venturi Valves
    Mike Amstadt, BCxP, Associate Member, Mead & Hunt, Middleton, WI

Product Details

Published:
2022
Units of Measure:
Dual
File Size:
1 file
Product Code(s):
D-TO22Sem-50
Note:
This product is unavailable in Russia, Belarus