Sale!

Seminar 53 — Fellows Debate: Commissioning Is Not Part of the Construction Contractor’s Turnover Package

$24.50

Conference Proceeding by ASHRAE, 2016

Category:

Description

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

The design and construction marketplace has and will change. Clients want buildings that work. Commissioning is vital to prove that the building performs satisfactorily. Practice posits that commissioning takes place during the whole construction period and does not finish until at least one year after turnover to the owner. It is also argued that formal documentation and proof of performance is required as part of the turnover documentation. Alternatively this cannot happen in a organically growing building–things are always changing. Both sides of the argument must be understood to write good work scopes and contract documents.

Fellows Debate
Larry Spielvogel, P.E., Fellow Life Member, E. Mitchell Swann, P.E., Member, Dennis Knight, P.E., Fellow ASHRAE, Nick Mead, FCIBSE, President CIBSE, CEng, Honorable Katherine G. Hammack, Member, Richard Rooley, FREng, Presidential Fellow ASHRAE, Don Beaty, P.E., Fellow ASHRAE
Product Contains: Slides (pdf), Audio (mp3), Recorded Presentation (mp4), Recorded Presentation (flv)

Run Time: 90 mins.

Citation: ASHRAE Seminar Recordings, 2016 Winter Conference, Orlando, FL

Product Details

Published:
2016
File Size:
1 file , 240 KB
Product Code(s):
D-OR16Sem53